Project Planning Tool

Site Readiness Checklist

Use this checklist to prepare your site before requesting or installing a temporary structure. It helps identify access, surface, anchoring, layout, utility, and documentation details that can affect schedule, cost, and feasibility.

Before Install

What this helps confirm.

01

Truck access, equipment access, staging room, and delivery windows.

02

Surface type, anchoring approach, drainage, and site conditions.

03

Photos, drawings, permits, restrictions, and timeline readiness.

Site Checklist

Check the items you already know or have ready.

This checklist is not a final engineering or permitting review. It gives Maxi Structures a better starting point when reviewing your site, structure scope, and project timeline.

01

Access & Logistics

02

Surface & Anchoring

03

Layout & Use

04

Site Conditions

05

Documents & Timeline

Common Issues

What usually slows down temporary structure projects.

Most delays come from unclear access, unknown anchoring requirements, missing layout details, or site restrictions that are not discovered until late in the process.

01

Access not confirmed

Delivery trucks, forklifts, and install crews need a realistic path into the work area.

02

Surface questions

Concrete, asphalt, gravel, soil, and slabs can require different anchoring or ballast planning.

03

Missing site photos

Photos help identify slope, obstructions, nearby buildings, overhead conflicts, and staging space.

04

Timeline pressure

Emergency and fast-turn projects move better when site details, scope, and approvals are ready early.

What Maxi Reviews

We look at the whole site, not just the structure size.

A temporary structure plan depends on the building footprint, surface, anchoring method, wind exposure, use case, door placement, equipment movement, and the way crews can safely access the site.

AccessHow materials, equipment, and crews reach the install location.
SurfaceWhat the structure sits on and how it may be anchored or ballasted.
UseWhat is happening inside the structure and how people or equipment move.
ScopeHow long the structure is needed and what add-ons are required.
Ready to review your site?

Send your project details to Maxi.

Share your site location, timeline, structure use, photos, and any restrictions. Our team can help determine the right next step for your project.